|
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.
|
The Waste Pits Remeidal Action Project (WPRAP) involves the remediation of six waste pits, the Burn Pit, the Clearwell, miscellaneous structures, facilities, and soil. More than 1 million tons of contaminated materials are associated with the cleanup project. The Shaw Group, formerly IT Corporation, constructed the remediation facilities for the project, which include a Material Handling Building, where excavated wastes from the pit area will be sorted, blended and treated, Gas Control System/Water Treatment System (GCS/WTS) Building, and the Railcar Loadout Building, where material is loaded into railcars for shipment to Environcare of Utah.
|
|