NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.

Internals Removal
All work was performed dry because of the condition of the reactor tank and the lack of water processing on the site. All the work on the internals was done remotely until dose levels allowed the final pieces to be removed hands on. Dose levels prohibited using standard long handle tools from a platform. Instead, operators were positioned 20-feet (6-meters) above the work and 6-feet (2-meters) from the edge. Although a shield was used it's ALARA benefit was to keep the operators outside of the gamma "plume" that was exiting the vessel opening.

Internals Removal

All work was performed dry because of the condition of the reactor tank and the lack of water processing on the site. All the work on the internals was done remotely until dose levels allowed the final pieces to be removed hands on. Dose levels prohibited using standard long handle tools from a platform. Instead, operators were positioned 20-feet (6-meters) above the work and 6-feet (2-meters) from the edge. Although a shield was used it's ALARA benefit was to keep the operators outside of the gamma "plume" that was exiting the vessel opening.

scan0070.jpg 116.JPG main-2.jpg Don_Quixote_does_an_outage.JPG 2008885.jpg
File information
Filename:main-2.jpg
Album name:Rennhack / Plum Brook
Rating (7 votes):55555
Filesize:11 KiB
Date added:Mar 22, 2009
Dimensions:255 x 188 pixels
Displayed:1879 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=7433
Favorites:Add to Favorites