Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.
Workers are Trained how to Operate the Silo 3 Excavator.
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.
Silo 3 Treatment Facility
Fernald Silo 3 Project - Shipping Preparations
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.
Fernald Silo 3 Project - Shipping Preparations
Fernald Silo 3 Project - Waste Packaging
Fernald Silo 3 Project - Shipping Container
Fernald Silo 3 Project - Waste Retrieval
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.
Operating Engineers use Shears to Cut Away Sections of Plant 8.
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.
Workers Install Insulation on Piping in the TTA Building.
Electricians Install Various Sizes of Conduit in the Electrical Room.
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.
Plants 2, 3 and 8 After Demolition.
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.
Early Demolition Stages of Plants 2, 3 and 8.
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).
Two Crews Work to Remove Waste Material from Pit 2.
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.
Fernald's K-65 Silos are Gone.
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).
An Iron Worker Installs Rebar at Valve House 7.
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.
Workers Topple the Bulk Lime Handling Building.
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.
Fernald Silo 3 Project - Waste Packaging Station
Fermald Map
Conceptual Image
Fernald Map
The Miamisburg Environment Management Project (MEMP)
Fernald Environmental Project (FEMP)
Fernald Environmental Project (FEMP)
Fernald Environmental Project (FEMP)
Fernald
Decontamination & Demolition
Ecological Restoration
Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.