Ratings
River Bend
- Above Average
- 6 (12%)
- Average
- 12 (25%)
- Below Average
- 30 (62%)
Facility Statistics
Lifecycle & Tenure
Operating Age: 39.8 Yrs
Build Time: 9.2 Yrs
Lic. Remaining: 19.4 Yrs
Production & Power
Lifetime CF: 86.3%
Efficiency: 31.3%
Generated: 199.0 TWh
Reliability & Outages
Record Run: 752 Days
Refuelings: 15
Ownership & Construction
Technical Specs
Reactor Type:
BWR
Containment:
BWR-MARK 3
NSS Supplier:
GE 6
Thermal Power:
3091 MWt
Net Capacity:
968 MWe
Efficiency:
31.3%
Status:
Operating
Licensing
Docket #:
05000458
License #:
NPF-47
License Type:
OL-FP
Const. Permit:
1977-03-25
Operating Lic:
1985-11-20
Commercial Op:
1986-06-16
License Renewed:
2018-12-20
License Exp:
2045-08-29
Facility Map
30.7256, -91.3726