A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.1145 viewsMar 27, 2026 at 07:18 AM
The diamond-wire saw cuts through a section of the bio-shield, with the thermal column shown at the upper left of the photo.1602 viewsMar 27, 2026 at 07:18 AM
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.1199 viewsMar 27, 2026 at 07:18 AM
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.1200 viewsMar 27, 2026 at 07:18 AM
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.1293 viewsMar 27, 2026 at 07:18 AM
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.1161 viewsMar 27, 2026 at 07:18 AM