Last additions - North America
|
Loading "Hot" pieces into HIRP (square), cold pieces out of HIRP. Piece by piece.....Nov 03, 2005
|
|
Loaded Liner CaskNov 03, 2005
|
|
Tommy and Josh Processing CRD BladesNov 03, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Oct 31, 2005
|
|
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.Oct 30, 2005
|
|
Workers are Trained how to Operate the Silo 3 Excavator.Oct 30, 2005
|
|
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.Oct 30, 2005
|
|
Silo 3 Treatment FacilityOct 30, 2005
|
|
Fernald Silo 3 Project - Shipping PreparationsOct 30, 2005
|
|
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.Oct 30, 2005
|
|
Fernald Silo 3 Project - Shipping PreparationsOct 30, 2005
|
|
Fernald Silo 3 Project - Waste PackagingOct 30, 2005
|
|
Oct 30, 2005
|
|
Fernald Silo 3 Project - Shipping ContainerOct 30, 2005
|
|
Fernald Silo 3 Project - Waste RetrievalOct 30, 2005
|
|
Oct 30, 2005
|
|
Oct 30, 2005
|
|
Oct 30, 2005
|
|
Oct 30, 2005
|
|
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).Oct 30, 2005
|
|
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.Oct 30, 2005
|
|
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.Oct 30, 2005
|
|
Operating Engineers use Shears to Cut Away Sections of Plant 8.Oct 30, 2005
|
|
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.Oct 30, 2005
|
|
Workers Install Insulation on Piping in the TTA Building.Oct 30, 2005
|
|
Electricians Install Various Sizes of Conduit in the Electrical Room.Oct 30, 2005
|
|
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.Oct 30, 2005
|
|
Plants 2, 3 and 8 After Demolition.Oct 30, 2005
|
|
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.Oct 30, 2005
|
|
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.Oct 30, 2005
|
|
Early Demolition Stages of Plants 2, 3 and 8.Oct 30, 2005
|
|
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).Oct 30, 2005
|
|
Two Crews Work to Remove Waste Material from Pit 2.Oct 30, 2005
|
|
4663 files on 59 page(s) |
|
|
|
|
|
26 | |
|
|
|
|