Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).837 views
836 views
836 views
834 views
834 views
833 views
833 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.832 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.832 views
832 views
Fernald Environmental Project (FEMP)830 views
830 views
829 views
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.828 views
828 views
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.827 views
823 views
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.821 views
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.794 views
Fermald Map793 views
792 views
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.787 views
Two Crews Work to Remove Waste Material from Pit 2.787 views
787 views
786 views
784 views
784 views
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.782 views
Plants 2, 3 and 8 After Demolition.782 views
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.782 views
781 views
781 views
Fernald Map779 views
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.779 views
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.779 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.770 views