A Supervisor Gives Instructions to an Operating Engineer in Pit 3.736 views
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).736 views
735 views
732 views
Fernald Environmental Project (FEMP)731 views
731 views
731 views
730 views
730 views
729 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.726 views
726 views
Fernald Environmental Project (FEMP)725 views
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.725 views
724 views
723 views
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.722 views
720 views
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.718 views
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.696 views
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.696 views
696 views
695 views
695 views
Fermald Map694 views
Two Crews Work to Remove Waste Material from Pit 2.692 views
692 views
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.691 views
690 views
690 views
689 views
686 views
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.685 views
685 views
683 views
Plants 2, 3 and 8 After Demolition.682 views
682 views
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.681 views
681 views
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.680 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.671 views