Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).405 views
404 views
403 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.401 views
401 views
401 views
Fernald Environmental Project (FEMP)399 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.399 views
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.397 views
Silo 3 Treatment Facility397 views
397 views
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.394 views
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.374 views
374 views
374 views
373 views
371 views
371 views
Fermald Map369 views
366 views
366 views
366 views
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.364 views
364 views
364 views
364 views
364 views
Plants 2, 3 and 8 After Demolition.363 views
Conceptual Image361 views
361 views
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.360 views
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.359 views
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.359 views
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.354 views
354 views
353 views
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.351 views
351 views
Two Crews Work to Remove Waste Material from Pit 2.350 views
350 views
349 views
349 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.348 views