Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).602 views
602 views
Fernald Environmental Project (FEMP)601 views
601 views
600 views
598 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.597 views
596 views
Fernald Environmental Project (FEMP)593 views
593 views
592 views
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.591 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.591 views
591 views
590 views
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.589 views
589 views
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.587 views
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.566 views
566 views
564 views
564 views
563 views
561 views
561 views
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.560 views
Conceptual Image559 views
Fermald Map558 views
Two Crews Work to Remove Waste Material from Pit 2.558 views
558 views
558 views
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.554 views
552 views
551 views
551 views
550 views
550 views
Plants 2, 3 and 8 After Demolition.548 views
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.548 views
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.545 views
545 views
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.544 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.542 views