Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).667 views
667 views
667 views
666 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.664 views
664 views
664 views
663 views
Fernald Environmental Project (FEMP)661 views
660 views
659 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.658 views
658 views
658 views
658 views
657 views
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.654 views
Fernald Environmental Project (FEMP)652 views
652 views
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.651 views
648 views
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.647 views
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.628 views
627 views
Fermald Map626 views
626 views
626 views
Conceptual Image625 views
624 views
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.623 views
Two Crews Work to Remove Waste Material from Pit 2.622 views
622 views
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.621 views
619 views
619 views
618 views
615 views
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.614 views
Plants 2, 3 and 8 After Demolition.614 views
614 views
611 views
611 views
611 views
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.610 views
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.609 views
609 views
605 views
Fernald Map604 views
604 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.603 views