Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).483 views
483 views
478 views
477 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.476 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.476 views
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.469 views
469 views
466 views
466 views
465 views
465 views
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.464 views
464 views
462 views
459 views
457 views
457 views
455 views
453 views
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.450 views
450 views
450 views
449 views
448 views
447 views
447 views
445 views
Fermald Map444 views
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.444 views
441 views
Plants 2, 3 and 8 After Demolition.440 views
440 views
439 views
439 views
439 views
Conceptual Image438 views
438 views
438 views
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.436 views
436 views
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.434 views
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.433 views
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.426 views
Two Crews Work to Remove Waste Material from Pit 2.426 views
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.426 views
426 views
425 views
425 views
425 views
425 views
424 views
424 views
422 views
422 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.421 views