Workers are Trained how to Operate the Silo 3 Excavator.
Workers will remove 5,100 cubic yards of low-level cold metal oxide waste from Silo 3. Waste from the production process was placed in the silo between 1952 and 1957. Workers will use pneumatic and mechanical retrieval systems to remove the waste from the silo and package it in soft-sided containers for off site shipment. The waste will be treated only as required to meet commercially permitted facility's waste acceptance criteria. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Photo details
Filename
fernald_silo_9.jpg
Album name
Rennhack / Fernald (FEMP)
Rating (1 votes)
55555
Date
Mar-31-2004
Filesize
53 KiB
Date added
Oct 30, 2005
Dimensions
288 x 192 pixels
Displayed
1451 times
Favorites
Add to Favorites