Last viewed - Two Crews Work to Remove Waste Material from Pit 2.

Two Crews Work to Remove Waste Material from Pit 2.
The Waste Pits Remedial Action Project (WPRAP) involves the remediation of six waste pits, the Burn Pit, the Clearwell, miscellaneous structures, facilities, and soil. More than 1 million tons of contaminated materials are associated with the cleanup project. The Shaw Group, formerly IT Corporation, constructed the remediation facilities for the project, which include a Material Handling Building, where excavated wastes from the pit area will be sorted, blended and treated, Gas Control System/ Water Treatment System (GCS/WTS) Building, and the Railcar Loadout Building, where material is loaded into railcars for shipment to Envirocare of Utah.
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Filename fernald_cells_3.jpg
Album name Rennhack / Fernald (FEMP)
Date Mar-31-2004
Credits DOE Photo
Filesize 56 KiB
Date added Oct 30, 2005
Dimensions 288 x 192 pixels
Displayed 1037 times
Favorites Add to Favorites