Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).
A balanced approach to waste disposition has been developed at Fernald, one in which the majority of the site's contaminated material will be placed in an On-Site Disposal Facility (OSDF) for its final disposition, where as, a smaller volume of more highly contaminated waste will be sent off site. The OSDF is being constructed on the east side of the Fernald Site and will ultimately hold approximately 2.5 million cubic yards of impacted material. The facility is being constructed in phases. Phase V consists of waste placement in Cells 3, 4, 5, and 6, construction of the Cell 7 and 8 liners, the placement of the final cover on all remaining cells and screening of clay liner and cover material in the Borrow Area. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Photo details
Filename
fernald_cells_6.jpg
Album name
Rennhack / Fernald (FEMP)
Rating (1 votes)
44444
Date
Feb-29-2004
Filesize
52 KiB
Date added
Oct 30, 2005
Dimensions
288 x 192 pixels
Displayed
1462 times
Favorites
Add to Favorites