NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.

Operating Engineers use Shears to Cut Away Sections of Plant 8.
Plant 8, the Scrap Recovery Plant, recycled residues and scrap from the uranium production process. Ores, concentrates and process residues were roasted to oxidize the impurities and then filtered. The filtered material was converted to free flowing powder and transferred to Plant 2 for further processing. The D&D of the plants consists of surface decontamination, building and equipment dismantlement, size reduction of building material and the loading of demolition debris into rolloff boxes for transfer on the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)

Operating Engineers use Shears to Cut Away Sections of Plant 8.

Plant 8, the Scrap Recovery Plant, recycled residues and scrap from the uranium production process. Ores, concentrates and process residues were roasted to oxidize the impurities and then filtered. The filtered material was converted to free flowing powder and transferred to Plant 2 for further processing. The D&D of the plants consists of surface decontamination, building and equipment dismantlement, size reduction of building material and the loading of demolition debris into rolloff boxes for transfer on the On-Site Disposal Facility.

10444511_542089909246280_5918337706007054379_n.jpg Seabrook.jpg fernald_cells_1.jpg 2008882.jpg sgrp_01.JPG
File information
Filename:fernald_DnD_12.jpg
Album name:Rennhack / Fernald (FEMP)
Rating (1 votes):55555
Keywords:Fernald / Closure / Project / Fernald / Green / Salt / Plant, / Feed / Materials / Production / Center, / Fernald, / Ohio / (FEMP)
Date:Feb-29-2004
Credits:DOE Photo
Filesize:53 KiB
Date added:Oct 30, 2005
Dimensions:288 x 192 pixels
Displayed:1162 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=3992
Favorites:Add to Favorites