NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.

Wright-Patterson Air Force Base Bldg. 470
The Nuclear Engineering Test Facility resulted from a 1954 Air Force initiative to develop a nuclear powered aircraft. Construction began in 1956 and continued despite cancellation of the nuclear propulsion project the next year. When completed in 1960, the light water cooled test reactor was the Air Force's only research reactor and the seventh largest of its kind in the nation. It had a ten megawatt capacity and could accommodate a full scale jet engine. Its internal facilities were not completed until 1965, the same year the Air Force Institute of Technology accepted operational control and safety responsibility for the reactor. The reactor's first nuclear chain reaction was achieved in April 1965. AFIT, civilian institutions, and Department of Defense agencies used the reactor for a variety of projects, ranging from biomedical studies to solid-state electronics. The reactor was operated for the last time on June 12, 1970 and decommissioned in June 1971.
Keywords: Air Force, Ohio, Reactor, decommissioned

Wright-Patterson Air Force Base Bldg. 470

The Nuclear Engineering Test Facility resulted from a 1954 Air Force initiative to develop a nuclear powered aircraft. Construction began in 1956 and continued despite cancellation of the nuclear propulsion project the next year. When completed in 1960, the light water cooled test reactor was the Air Force's only research reactor and the seventh largest of its kind in the nation. It had a ten megawatt capacity and could accommodate a full scale jet engine. Its internal facilities were not completed until 1965, the same year the Air Force Institute of Technology accepted operational control and safety responsibility for the reactor. The reactor's first nuclear chain reaction was achieved in April 1965. AFIT, civilian institutions, and Department of Defense agencies used the reactor for a variety of projects, ranging from biomedical studies to solid-state electronics. The reactor was operated for the last time on June 12, 1970 and decommissioned in June 1971.

2012178.jpg DSC02766.jpg bldg470-3.JPG 8_1407_1.jpg CFD.JPG
File information
Filename:bldg470-3.JPG
Album name:Mounder / Wright-Patterson Air Force Base
Rating (6 votes):55555
Keywords:Air / Force, / Ohio, / Reactor, / decommissioned
Date:09/04/07
Credits:Mounder
Filesize:14 KiB
Date added:Sep 04, 2007
Dimensions:250 x 172 pixels
Displayed:3610 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=6262
Favorites:Add to Favorites

Comment 1 to 1 of 1
Page: 1

DecommMan   [Dec 24, 2007 at 04:02 PM]
Sweet

Comment 1 to 1 of 1
Page: 1