An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.
The Analytical Laboratory housed the analytical, metallurgical and chemical process laboratories and was divided into restricted and non-restricted areas. During Fernald's production era the facility was used to verify the uranium product quality. The laboratory used state of the art technology and various chemicals during the preparation and determination of the analytical result. More recently, the laboratory staff processed various samples associated with cleanup. The D&D of the Lab consists of asbestos abatement, building and equipment dismantlement, size reduction of building material and loading for transfer to the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Photo details
Filename
fernald_DnD_11.jpg
Album name
Rennhack / Fernald (FEMP)
Date
Mar-31-2004
Filesize
45 KiB
Date added
Oct 30, 2005
Dimensions
288 x 192 pixels
Displayed
1339 times
Favorites
Add to Favorites