A Supervisor Gives Instructions to an Operating Engineer in Pit 3.
The Waste Pits Remeidal Action Project (WPRAP) involves the remediation of six waste pits, the Burn Pit, the Clearwell, miscellaneous structures, facilities, and soil. More than 1 million tons of contaminated materials are associated with the cleanup project. The Shaw Group, formerly IT Corporation, constructed the remediation facilities for the project, which include a Material Handling Building, where excavated wastes from the pit area will be sorted, blended and treated, Gas Control System/Water Treatment System (GCS/WTS) Building, and the Railcar Loadout Building, where material is loaded into railcars for shipment to Environcare of Utah. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Photo details
Filename
fernald_cells_4.jpg
Album name
Rennhack / Fernald (FEMP)
Rating (1 votes)
55555
Date
Mar-31-2004
Filesize
55 KiB
Date added
Oct 30, 2005
Dimensions
288 x 192 pixels
Displayed
1416 times
Favorites
Add to Favorites