An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.1163 viewsMar 27, 2026 at 09:05 AM
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).1246 viewsMar 27, 2026 at 09:05 AM
Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1786 viewsMar 27, 2026 at 09:05 AM
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.1179 viewsMar 27, 2026 at 09:05 AM