Last additions - Fernald (FEMP)
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Oct 31, 2005
|
|

Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.Oct 30, 2005
|
|

Workers are Trained how to Operate the Silo 3 Excavator.Oct 30, 2005
|
|

Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.Oct 30, 2005
|
|

Silo 3 Treatment FacilityOct 30, 2005
|
|

Fernald Silo 3 Project - Shipping PreparationsOct 30, 2005
|
|

Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.Oct 30, 2005
|
|

Fernald Silo 3 Project - Shipping PreparationsOct 30, 2005
|
|

Fernald Silo 3 Project - Waste PackagingOct 30, 2005
|
|

Oct 30, 2005
|
|

Fernald Silo 3 Project - Shipping ContainerOct 30, 2005
|
|

Fernald Silo 3 Project - Waste RetrievalOct 30, 2005
|
|

Oct 30, 2005
|
|

Oct 30, 2005
|
|

Oct 30, 2005
|
|

Oct 30, 2005
|
|

Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).Oct 30, 2005
|
|

An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.Oct 30, 2005
|
|

Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.Oct 30, 2005
|
|

Operating Engineers use Shears to Cut Away Sections of Plant 8.Oct 30, 2005
|
|

Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.Oct 30, 2005
|
|

Workers Install Insulation on Piping in the TTA Building.Oct 30, 2005
|
|

Electricians Install Various Sizes of Conduit in the Electrical Room.Oct 30, 2005
|
|

The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.Oct 30, 2005
|
|

Plants 2, 3 and 8 After Demolition.Oct 30, 2005
|
|

The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.Oct 30, 2005
|
|

Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.Oct 30, 2005
|
|

Early Demolition Stages of Plants 2, 3 and 8.Oct 30, 2005
|
|

Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).Oct 30, 2005
|
|

Two Crews Work to Remove Waste Material from Pit 2.Oct 30, 2005
|
|

A Supervisor Gives Instructions to an Operating Engineer in Pit 3.Oct 30, 2005
|
|

Fernald's K-65 Silos are Gone.Oct 30, 2005
|
|

The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.Oct 30, 2005
|
|

A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).Oct 30, 2005
|
|

An Iron Worker Installs Rebar at Valve House 7.Oct 30, 2005
|
|

An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.Oct 30, 2005
|
|

A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.Oct 30, 2005
|
|

Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.Oct 30, 2005
|
|

Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.Oct 30, 2005
|
|

A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.Oct 30, 2005
|
|

A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.Oct 30, 2005
|
|

Workers Topple the Bulk Lime Handling Building.Oct 30, 2005
|
|

Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.Oct 30, 2005
|
|

Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.Oct 30, 2005
|
|

Fernald Silo 3 Project - Waste Packaging StationOct 30, 2005
|
|

Fermald MapOct 30, 2005
|
|

Conceptual ImageOct 30, 2005
|
|

Fernald MapOct 30, 2005
|
|

Fernald Environmental Project (FEMP)Mar 13, 2005
|
|

Fernald Environmental Project (FEMP)Mar 13, 2005
|
|

Fernald Environmental Project (FEMP)Mar 13, 2005
|
|

FernaldMar 13, 2005
|
|

Decontamination & DemolitionMar 13, 2005
|
|
|