SPECTROMETER IN END STATION AT THE STANFORD LINEAR ACCELERATOR.
TECHNICIAN AT THE B FACTORY'S HUGE BABAR DETECTOR SYSTEM AT THE STANFORD LINEAR ACCELERATOR CENTER.
Stanford Linear Accelerator Map
Stanford Linear Accelerator Speakers
Stanford Linear Accelerator Detector
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.
Workers are Trained how to Operate the Silo 3 Excavator.
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.
Silo 3 Treatment Facility
Fernald Silo 3 Project - Shipping Preparations
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.
Fernald Silo 3 Project - Shipping Preparations
Fernald Silo 3 Project - Waste Packaging
Fernald Silo 3 Project - Shipping Container
Fernald Silo 3 Project - Waste Retrieval
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.
Operating Engineers use Shears to Cut Away Sections of Plant 8.