Image search results - "green"
|

Gas into Metal
|
|

Uranium Green Salt
|
|

Fernald Feed Materials Production Center
|
|

Cooling the Derby
|
|

Sampling the Derby
|
|

Ingots of Fernald at Ashtabula
|
|

Back to Fernald
|
|

Laundry
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.
|
|

Workers are Trained how to Operate the Silo 3 Excavator.
|
|

Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.
|
|

Silo 3 Treatment Facility
|
|

Fernald Silo 3 Project - Shipping Preparations
|
|

Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.
|
|

Fernald Silo 3 Project - Shipping Preparations
|
|

Fernald Silo 3 Project - Waste Packaging
|
|
|

Fernald Silo 3 Project - Shipping Container
|
|

Fernald Silo 3 Project - Waste Retrieval
|
|
|
|
|
|

Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).
|
|

An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.
|
|

Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.
|
|

Operating Engineers use Shears to Cut Away Sections of Plant 8.
|
|

Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.
|
|

Workers Install Insulation on Piping in the TTA Building.
|
|

Electricians Install Various Sizes of Conduit in the Electrical Room.
|
|

The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.
|
|

Plants 2, 3 and 8 After Demolition.
|
|
|