Salt Lake City Site - Fire Station Before Excavation to Remove Mill Tailings - Exterior View
Gas into Metal
Uranium Green Salt
Fernald Feed Materials Production Center
Cooling the Derby
Sampling the Derby
Ingots of Fernald at Ashtabula
Back to Fernald
Laundry
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.
Workers are Trained how to Operate the Silo 3 Excavator.
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.
Silo 3 Treatment Facility
Fernald Silo 3 Project - Shipping Preparations
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.
Fernald Silo 3 Project - Shipping Preparations
Fernald Silo 3 Project - Waste Packaging
Fernald Silo 3 Project - Shipping Container
Fernald Silo 3 Project - Waste Retrieval
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.
Operating Engineers use Shears to Cut Away Sections of Plant 8.
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.
Workers Install Insulation on Piping in the TTA Building.
Electricians Install Various Sizes of Conduit in the Electrical Room.
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.