Help | Contact Us
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.


Most viewed - Fernald (FEMP)
Public Tours.jpg
Public Tours2043 views
Fernald Topples Last Uranium Production Building.jpg
Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.946 views
fernald_DnD_4.jpg
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.930 views
18.jpg
Sampling the Derby879 views
Water Treatment Bypass Process.jpg
Water Treatment Bypass Process856 views
813686730218b5422fbc5583.medium.jpg
806 views
14.jpg
Uranium Green Salt781 views
19.jpg
Ingots of Fernald at Ashtabula771 views
2012168.jpg
756 views
25.jpg
Laundry742 views
17.jpg
Cooling the Derby735 views
24.jpg
Back to Fernald733 views
2012964.jpg
Workers Topple the Bulk Lime Handling Building.713 views
15.jpg
Fernald Feed Materials Production Center676 views
Waste Pits Project.jpg
Waste Pits Project664 views
70.jpg
Gas into Metal651 views
2009809.jpg
649 views
Silos 1 and 2 Project.jpg
Silos 1 and 2 Project647 views
2012967.jpg
643 views
2011140.jpg
636 views
Silo 3 Project.jpg
Silo 3 Project580 views
2009812.jpg
562 views
2012972.jpg
559 views
2012974.jpg
554 views
2011139.jpg
554 views
Decontamination & Demolition.jpg
Decontamination & Demolition547 views
2012971.jpg
538 views
2012705.jpg
536 views
2012983.jpg
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.532 views
2012707.jpg
531 views
2011665.jpg
520 views
Ecological Restoration.jpg
Ecological Restoration517 views
fernald_cells_2.jpg
An Iron Worker Installs Rebar at Valve House 7.516 views
2012773.jpg
516 views
2012968.jpg
514 views
fernald_silo_2.jpg
Fernald Silo 3 Project - Waste Packaging513 views
2012970.jpg
513 views
2011664.jpg
511 views
2012772.jpg
508 views
2012969.jpg
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.505 views
fernald_silo_1.jpg
Fernald Silo 3 Project - Waste Retrieval504 views
2012966.jpg
502 views
2012702.jpg
499 views
2012703.jpg
496 views
2012973.jpg
495 views
fernald_llrw_5.jpg
487 views
2011414.jpg
486 views
2010147.jpg
485 views
d6997bebc981dba6fdc3c603.medium.jpg
485 views
fernald_DnD_10.jpg
Electricians Install Various Sizes of Conduit in the Electrical Room.480 views
fernald_DnD_0.jpg
Early Demolition Stages of Plants 2, 3 and 8.472 views
5ffaa93d84063721ae8440e5.medium.jpg
468 views
2012178.jpg
467 views
2010141.jpg
460 views
fernald_silo_9.jpg
Workers are Trained how to Operate the Silo 3 Excavator.458 views
2012190.jpg
457 views
2012704.jpg
457 views
2010136.jpg
457 views
2010146.jpg
455 views
fernald_DnD_8.jpg
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.452 views
2008966.jpg
447 views
fernald-map3.jpg
Fernald446 views
fernald_llrw_3.jpg
441 views
fernald_silo_7.jpg
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.440 views
2012708.jpg
438 views
2008967.jpg
438 views
fernald_DnD_9.jpg
Workers Install Insulation on Piping in the TTA Building.437 views
2010148.jpg
436 views
2012978.jpg
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.434 views
fernald_silo_10.jpg
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.434 views
fernald_cells_5.jpg
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).431 views
fernald_DnD_12.jpg
Operating Engineers use Shears to Cut Away Sections of Plant 8.430 views
fernald_DnD_2.jpg
Fernald's K-65 Silos are Gone.427 views
2012706.jpg
425 views
2012033.jpg
424 views
fernald_silo_4.jpg
Fernald Silo 3 Project - Shipping Preparations419 views
femp_fig1.jpg
Fernald Environmental Project (FEMP)418 views
2010142.jpg
416 views
2010150.jpg
415 views
fernald-map1.jpg
Fernald Environmental Project (FEMP)414 views
167 files on 3 page(s) 1



NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2025 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?