Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.946 views
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.930 views
Sampling the Derby879 views
Water Treatment Bypass Process856 views
806 views
Uranium Green Salt781 views
Ingots of Fernald at Ashtabula771 views
756 views
Laundry742 views
Cooling the Derby735 views
Back to Fernald733 views
Workers Topple the Bulk Lime Handling Building.713 views
Fernald Feed Materials Production Center676 views
Waste Pits Project664 views
Gas into Metal651 views
649 views
Silos 1 and 2 Project647 views
643 views
636 views
Silo 3 Project580 views
562 views
559 views
554 views
554 views
Decontamination & Demolition547 views
538 views
536 views
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.532 views
531 views
520 views
Ecological Restoration517 views
An Iron Worker Installs Rebar at Valve House 7.516 views
516 views
514 views
Fernald Silo 3 Project - Waste Packaging513 views
513 views
511 views
508 views
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.505 views
Fernald Silo 3 Project - Waste Retrieval504 views
502 views
499 views
496 views
495 views
487 views
486 views
485 views
485 views
Electricians Install Various Sizes of Conduit in the Electrical Room.480 views
Early Demolition Stages of Plants 2, 3 and 8.472 views
468 views
467 views
460 views
Workers are Trained how to Operate the Silo 3 Excavator.458 views
457 views
457 views
457 views
455 views
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.452 views
447 views
Fernald446 views
441 views
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.440 views
438 views
438 views
Workers Install Insulation on Piping in the TTA Building.437 views
436 views
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.434 views
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.434 views
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).431 views
Operating Engineers use Shears to Cut Away Sections of Plant 8.430 views