Help
|
Contact Us
NukeWorker Menu
Nuclear Pictures
NukeWorker online photo album.
Home
Register
Login
Album list
Last uploads
Last comments
Most viewed
Top rated
By date
My Favorites
Search
Home
>
Nuclear Facilities
>
North America
>
USA
>
Region III (Mid West)
>
Fernald (FEMP)
Most viewed - Fernald (FEMP)
Public Tours
2564 views
Sampling the Derby
1748 views
Uranium Green Salt
1702 views
Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.
1650 views
1618 views
Laundry
1602 views
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.
1582 views
Water Treatment Bypass Process
1525 views
Ingots of Fernald at Ashtabula
1511 views
1504 views
1485 views
1481 views
1454 views
Cooling the Derby
1453 views
Back to Fernald
1435 views
1385 views
Workers Topple the Bulk Lime Handling Building.
1382 views
1375 views
Gas into Metal
1372 views
Fernald Feed Materials Production Center
1370 views
1365 views
1359 views
Waste Pits Project
1351 views
Silos 1 and 2 Project
1303 views
1289 views
1269 views
1266 views
Decontamination & Demolition
1264 views
1263 views
Silo 3 Project
1261 views
1260 views
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.
1253 views
1235 views
Fernald Silo 3 Project - Waste Retrieval
1229 views
1215 views
1205 views
1202 views
1201 views
An Iron Worker Installs Rebar at Valve House 7.
1196 views
1195 views
1195 views
Fernald Silo 3 Project - Waste Packaging
1194 views
1188 views
1186 views
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.
1184 views
1184 views
1183 views
1181 views
1178 views
Ecological Restoration
1177 views
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.
1175 views
1175 views
1171 views
Electricians Install Various Sizes of Conduit in the Electrical Room.
1170 views
1166 views
Early Demolition Stages of Plants 2, 3 and 8.
1164 views
1164 views
Workers are Trained how to Operate the Silo 3 Excavator.
1164 views
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.
1160 views
1156 views
1155 views
Fernald Environmental Project (FEMP)
1151 views
Operating Engineers use Shears to Cut Away Sections of Plant 8.
1151 views
1148 views
Silo 3 Treatment Facility
1147 views
Fernald Silo 3 Project - Shipping Preparations
1142 views
1138 views
1137 views
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).
1136 views
Fernald's K-65 Silos are Gone.
1130 views
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.
1130 views
Workers Install Insulation on Piping in the TTA Building.
1127 views
1127 views
1126 views
1119 views
Fernald Environmental Project (FEMP)
1118 views
Fernald Silo 3 Project - Shipping Preparations
1117 views
1116 views
1115 views
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.
1111 views
167 files on 3 page(s)
1
2
3
NukeWorker ™ is a registered trademark of
NukeWorker.com ™
, LLC © 1996-2026 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement
|
Terms of Use
|
Code of Conduct
|
Spam Policy
|
Advertising Info
|
Contact Us
|
Forum Rules
|
Password Problem?