Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1021 views
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.1006 views
Sampling the Derby971 views
Water Treatment Bypass Process952 views
885 views
Uranium Green Salt878 views
866 views
Ingots of Fernald at Ashtabula849 views
Laundry840 views
Back to Fernald813 views
Cooling the Derby809 views
Workers Topple the Bulk Lime Handling Building.781 views
Fernald Feed Materials Production Center748 views
748 views
Waste Pits Project740 views
Gas into Metal729 views
729 views
Silos 1 and 2 Project720 views
719 views
681 views
Silo 3 Project662 views
648 views
635 views
Decontamination & Demolition629 views
628 views
616 views
612 views
612 views
610 views
609 views
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.606 views
Ecological Restoration597 views
An Iron Worker Installs Rebar at Valve House 7.593 views
593 views
Fernald Silo 3 Project - Waste Packaging591 views
589 views
587 views
586 views
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.582 views
582 views
577 views
Fernald Silo 3 Project - Waste Retrieval576 views
573 views
570 views
567 views
564 views
560 views
Electricians Install Various Sizes of Conduit in the Electrical Room.556 views
554 views
Early Demolition Stages of Plants 2, 3 and 8.551 views
545 views
543 views
Workers are Trained how to Operate the Silo 3 Excavator.539 views
538 views
535 views
534 views
534 views
532 views
532 views
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.522 views
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.520 views
Fernald518 views
Workers Install Insulation on Piping in the TTA Building.517 views
515 views
514 views
514 views
513 views
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.512 views
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.509 views
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).507 views
Operating Engineers use Shears to Cut Away Sections of Plant 8.503 views