Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).418 views
418 views
418 views
418 views
418 views
418 views
417 views
416 views
416 views
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).415 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.404 views
404 views
404 views
404 views
404 views
Fernald Environmental Project (FEMP)403 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.403 views
Painesville Locality Map403 views
403 views
403 views
Silo 3 Treatment Facility402 views
402 views
402 views
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.401 views
401 views
401 views
401 views
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.400 views