A Supervisor Gives Instructions to an Operating Engineer in Pit 3.695 views
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).695 views
695 views
695 views
694 views
694 views
694 views
693 views
693 views
693 views
Fernald Environmental Project (FEMP)692 views
692 views
691 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.690 views
690 views
688 views
688 views
688 views
688 views
688 views
688 views
excavating the "flats"688 views
688 views
Site A/Plot M Decommissioned Reactor Site687 views
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.686 views
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.686 views