Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.652 views
Two Crews Work to Remove Waste Material from Pit 2.652 views
652 views
Painesville Locality Map652 views
650 views
650 views
650 views
650 views
650 views
650 views
649 views
649 views
648 views
648 views
647 views
647 views
646 views
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.645 views
645 views
645 views
644 views
644 views
Plants 2, 3 and 8 After Demolition.643 views
643 views
642 views
642 views
642 views
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.641 views
640 views
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.639 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.634 views