NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Last viewed - Workers are Trained how to Operate the Silo 3 Excavator.

Workers are Trained how to Operate the Silo 3 Excavator.
Workers will remove 5,100 cubic yards of low-level cold metal oxide waste from Silo 3. Waste from the production process was placed in the silo between 1952 and 1957. Workers will use pneumatic and mechanical retrieval systems to remove the waste from the silo and package it in soft-sided containers for off site shipment. The waste will be treated only as required to meet commercially permitted facility's waste acceptance criteria. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Filename fernald_silo_9.jpg
Album name Rennhack / Fernald (FEMP)
Rating (1 votes) 55555
Date Mar-31-2004
Credits DOE Photo
Filesize 53 KiB
Date added Oct 30, 2005
Dimensions 288 x 192 pixels
Displayed 1178 times
Favorites Add to Favorites