A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.
Workers will remove 5,100 cubic yards of low-level cold metal oxide waste from Silo 3. Waste from the production process was placed in the silo between 1952 and 1957. Workers will use pneumatic and mechanical retrieval systems to remove the waste from the silo and package it in soft-sided containers for off site shipment. The waste will be treated only as required to meet commercially permitted facility's waste acceptance criteria. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Photo details
Filename
2012983.jpg
Album name
Rennhack / Fernald (FEMP)
Date
Feb-29-2004
Filesize
48 KiB
Date added
Oct 30, 2005
Dimensions
288 x 192 pixels
Displayed
1582 times
Favorites
Add to Favorites