Help | Contact Us
NukeWorker Logo
NukeWorker Logo
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.


Most viewed - Fernald (FEMP)
Public Tours.jpg
Public Tours2341 views
18.jpg
Sampling the Derby1320 views
Fernald Topples Last Uranium Production Building.jpg
Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1268 views
fernald_DnD_4.jpg
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.1252 views
Water Treatment Bypass Process.jpg
Water Treatment Bypass Process1249 views
14.jpg
Uranium Green Salt1218 views
2012168.jpg
1199 views
25.jpg
Laundry1154 views
813686730218b5422fbc5583.medium.jpg
1145 views
19.jpg
Ingots of Fernald at Ashtabula1092 views
2011140.jpg
1065 views
2009809.jpg
1058 views
17.jpg
Cooling the Derby1057 views
24.jpg
Back to Fernald1054 views
2009812.jpg
1050 views
2012964.jpg
Workers Topple the Bulk Lime Handling Building.1029 views
15.jpg
Fernald Feed Materials Production Center990 views
Waste Pits Project.jpg
Waste Pits Project989 views
70.jpg
Gas into Metal977 views
2012967.jpg
969 views
2011139.jpg
968 views
Silos 1 and 2 Project.jpg
Silos 1 and 2 Project960 views
2011665.jpg
942 views
2011664.jpg
913 views
Silo 3 Project.jpg
Silo 3 Project911 views
2012974.jpg
891 views
2012972.jpg
890 views
2012705.jpg
878 views
Decontamination & Demolition.jpg
Decontamination & Demolition875 views
2012983.jpg
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.863 views
2012773.jpg
859 views
2012772.jpg
855 views
2012971.jpg
855 views
2012707.jpg
854 views
2012966.jpg
848 views
fernald_silo_1.jpg
Fernald Silo 3 Project - Waste Retrieval841 views
2008966.jpg
838 views
fernald_cells_2.jpg
An Iron Worker Installs Rebar at Valve House 7.837 views
2012702.jpg
836 views
2012970.jpg
836 views
fernald_silo_2.jpg
Fernald Silo 3 Project - Waste Packaging835 views
2012969.jpg
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.834 views
2011414.jpg
826 views
2012968.jpg
826 views
Ecological Restoration.jpg
Ecological Restoration823 views
2012973.jpg
817 views
fernald_llrw_5.jpg
816 views
2012703.jpg
815 views
2012178.jpg
805 views
d6997bebc981dba6fdc3c603.medium.jpg
804 views
2010147.jpg
803 views
fernald_silo_9.jpg
Workers are Trained how to Operate the Silo 3 Excavator.801 views
2012704.jpg
797 views
2012190.jpg
795 views
fernald_DnD_0.jpg
Early Demolition Stages of Plants 2, 3 and 8.794 views
fernald_DnD_10.jpg
Electricians Install Various Sizes of Conduit in the Electrical Room.792 views
2010146.jpg
789 views
fernald_llrw_3.jpg
786 views
5ffaa93d84063721ae8440e5.medium.jpg
784 views
2010136.jpg
782 views
fernald_DnD_8.jpg
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.781 views
2010141.jpg
780 views
fernald_silo_7.jpg
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.779 views
2012978.jpg
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.772 views
2008967.jpg
771 views
fernald_DnD_12.jpg
Operating Engineers use Shears to Cut Away Sections of Plant 8.766 views
fernald_DnD_2.jpg
Fernald's K-65 Silos are Gone.763 views
fernald_DnD_9.jpg
Workers Install Insulation on Piping in the TTA Building.763 views
2012708.jpg
762 views
fernald_silo_10.jpg
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.759 views
fernald-map3.jpg
Fernald758 views
fernald_cells_5.jpg
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).757 views
femp_fig1.jpg
Fernald Environmental Project (FEMP)755 views
fernald_cells_6.jpg
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).748 views
fernald_silo_4.jpg
Fernald Silo 3 Project - Shipping Preparations748 views
2010142.jpg
748 views
2010148.jpg
747 views
fernald_silo_8.jpg
Silo 3 Treatment Facility745 views
2012706.jpg
744 views
fernald_silo_6.jpg
Fernald Silo 3 Project - Shipping Preparations743 views
167 files on 3 page(s) 1


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2025 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?