Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1352 views
Uranium Green Salt1341 views
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.1332 views
1326 views
Laundry1270 views
1234 views
1184 views
Ingots of Fernald at Ashtabula1181 views
1179 views
1172 views
Cooling the Derby1148 views
Back to Fernald1137 views
Workers Topple the Bulk Lime Handling Building.1116 views
1087 views
Fernald Feed Materials Production Center1077 views
Waste Pits Project1076 views
Gas into Metal1063 views
1058 views
1057 views
Silos 1 and 2 Project1043 views
1032 views
Silo 3 Project999 views
983 views
978 views
969 views
Decontamination & Demolition966 views
955 views
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.954 views
951 views
946 views
945 views
945 views
937 views
Fernald Silo 3 Project - Waste Retrieval924 views
924 views
923 views
Fernald Silo 3 Project - Waste Packaging922 views
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.921 views
An Iron Worker Installs Rebar at Valve House 7.921 views
915 views
Ecological Restoration912 views
907 views
906 views
904 views
897 views
893 views
892 views
891 views
Workers are Trained how to Operate the Silo 3 Excavator.888 views
885 views
Early Demolition Stages of Plants 2, 3 and 8.879 views
878 views
877 views
Electricians Install Various Sizes of Conduit in the Electrical Room.876 views
875 views
871 views
871 views
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.870 views
870 views
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.868 views
864 views
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.863 views
Operating Engineers use Shears to Cut Away Sections of Plant 8.857 views
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.853 views
Fernald852 views
Fernald's K-65 Silos are Gone.847 views
Workers Install Insulation on Piping in the TTA Building.847 views
847 views
Fernald Environmental Project (FEMP)843 views
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).838 views