Humboldt Bay 3

SAFSTOR

Pacific Gas & Electric·Eureka, CA·BWR·63 MWe

Technical specifications, photos, nearby jobs, satellite map, contact information, and per diem rates for Humboldt Bay 3.

SAFSTOR

Permanently shut down on 1976-07-02.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Humboldt Bay 3 BWR Natural cir. 63 1960-11-01 1963-04-18 1963-08-01 1976-07-02 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Humboldt Bay 3 65 65 220 1963-02-16 GENERAL ELECTRIC CO. GENERAL ELECTRIC CO.
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Humboldt Bay 3 4.8 TWh 68.4% 87.0% 83.9%
Operator: Pacific Gas and Electric Company
Owner: Pacific Gas and Electric Company
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Humboldt Bay AFR Dry Spent Fuel Storage Commercial In Operation Pacific Gas & Electric Co
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027. Lodging rates vary by month — click "Show Monthly" to see the breakdown.
$130
Lodging/Night
$130–$181 range
$86
M&IE/Day
$216
Total/Day
Eureka / Arcata / McKinleyville, Humboldt County, CA

Unemployment Benefits CA

?
Maximum state unemployment insurance benefits for CA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$450
Max Weekly
26
Max Weeks
$11,700
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
1034 6th Street
Eureka, CA 95501, USA
Get Directions
Phone: (707) 443-2787

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Humboldt Bay Nuclear Power Plant.

Humboldt Bay Unit 3 was a small boiling water reactor on the coast of Humboldt County, California, just south of Eureka in the King Salmon and Fields Landing area. Pacific Gas and Electric built it with a General Electric reactor.

Read more

Construction began on November 10, 1960, and the unit connected to the grid on April 18, 1963. In July 1970 an operator error caused a loss of cooling water, and the water level above the fuel dropped to just over 6 inches. The unit was permanently shut down on July 2, 1976, after refueling and seismic upgrade work, and it never restarted. It entered SAFSTOR in 1988, and decommissioning was completed in 2021.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Pacific Gas & Electric
PCG PG&E Corporation NYSE
$13.09 ▲ +0.13 (+1.00%)
Previous Close 12.96
Day's Range 12.92 – 13.25
52-Week Range 11.77 – 19.16
Volume 21,782,372
Delayed quote as of Oct 16, 2026 4:00 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
NSS Supplier: GE
Net Capacity: 63 MWe
Status: SAFSTOR

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Const. Permit: 1960-11-01
Operating Lic: 1963-04-18
Commercial Op: 1963-08-01