Savannah River Site (SRS)
Aiken, SC
Reactor Data
Research Reactors
Research and test reactors, critical assemblies and prototypes at this site, as listed in the IAEA Research Reactor Database: type, thermal power, first criticality, shutdown date, current status and what each is used for.
6 reactors: 5 decommissioned, 1 permanent shutdown.
| Reactor | Type | Thermal Power | First Criticality | Shutdown | Status | Used For |
|---|---|---|---|---|---|---|
| SR-305 Savannah River | Graphite | 50 Wt | 1952-12-01 | Decommissioned | materials testing | |
| SP Standard Pile | Graphite Pile | 1 kWt | 1953-07-25 | Decommissioned | materials testing | |
| PDP Process Development Pile | Heavy Water | 500 Wt | 1953-10-01 | Decommissioned | materials testing | |
| NTG Nuclear Test Gage | Subcrit | 1 Wt | 1958-11-01 | 1987-01-01 | Permanent shutdown | |
| HWCTR | Heavy Water | 61 MWt | 1962-03-01 | Decommissioned | materials testing | |
| LTR Lattice Test | Heavy Water | 500 Wt | 1967-01-27 | Decommissioned | materials testing |
Source: IAEA Research Reactor Database (RRDB), as of 2026-10-13.
Fuel Cycle Facilities
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
6 facilities: 2 in operation, 2 under construction, 2 others.
| Facility | Type | Scale | Design Capacity | Operated | Status | Operator |
|---|---|---|---|---|---|---|
| H-Canyon | Spent Fuel Reprocessing - aqueous route | 1955–2019 | In Operation | |||
| Savannah River (SRS) | AFR Wet Spent Fuel Storage (Pool) | Laboratory | 0 t HM | In Operation | Westinghouse Savannah River Company | |
| Savannah River (SRS) | Fuel Fabrication (U Pellet, Pin, FA) | Pilot plant | 70 t/year | 1978–1985 | Under Construction | U.S. DEPARTMENT OF ENERGY |
| MOX Fuel Fabrication Facility (MFFF) | MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) | 2016– | Under Construction | |||
| Actinide Packaging and Storage Fac. (APSF) | AFR Dry Spent Fuel Storage | Laboratory | 2001 t HM | Others | ||
| DeMOX - ToMOX | MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) | Commercial | 0 t HM/year | Others |
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.
Working Here
Jobs at Savannah River Site (SRS) 55 active
Active job listings posted for this specific facility on the NukeWorker job board. Click a job title for details, or the header to see them all.
More Jobs in SC 24 active
Active nuclear industry job listings in SC from the NukeWorker job board. Click a job title for full details, or click the header to search all jobs in this state.
Per Diem Rates FY 2027
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$113
Lodging/Night
$68
M&IE/Day
$181
Total/Day
Standard Rate, SC
Unemployment Benefits SC
Maximum state unemployment insurance benefits for SC. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$326
Max Weekly
20
Max Weeks
$6,520
Max Total
7-day waiting period before benefits begin
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
33.2485, -81.655
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
NukeWorker Member Ratings 42 votes
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Score uses a Bayesian average that accounts for vote count — facilities with few votes are pulled toward the fleet average, so rankings reflect confidence, not just raw percentages.
Above Average
9 (21%)
Average
14 (33%)
Below Average
19 (45%)
