Bailong

Technical specifications, photos, nearby jobs, and satellite map for Bailong.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 under construction.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Bailong 1 PWR CAP1000 1,160 2025-12-22 Under Construction
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Bailong 1 1,160 1,254 3,400 Shanghai Electric Nuclear Power Equipment Co., Ltd Harbin Electric Co., Ltd.
Operator: China Power Investment Guangxi Nuclear Power Co., Ltd.
Owner: China Power Investment Guangxi Nuclear Power Co., Ltd.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$170
Lodging/Night
$98
M&IE/Day
$268
Total/Day
China: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Fangchenggang, Guangxi, China
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: World Nuclear News: Early construction landmarks for Chinese units; NEI Magazine: First concrete for Bailong 1.

Bailong is a nuclear power plant site on the Jiangshan Peninsula in Fangchenggang, in the Guangxi Zhuang Autonomous Region of China.

Read more

China's State Council approved the first phase of two units in August 2024, as part of a group of 11 new reactors. The units are CAP1000 pressurized water reactors, the Chinese version of the Westinghouse AP1000. First concrete for the Unit 1 nuclear island basemat was poured on 22 December 2025.