Bataan

Technical specifications, photos, nearby jobs, and satellite map for Bataan.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$115
Lodging/Night
$65
M&IE/Day
$180
Total/Day
Philippines: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Morong, Bataan, Philippines
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: World Nuclear Association: nuclear power in the Philippines; Christian Science Monitor, 23 July 1993.

The Bataan Nuclear Power Plant at Napot Point, Morong, was the first nuclear power plant built in the Philippines: a single 621 MWe Westinghouse pressurized water reactor ordered after the 1973 oil crisis. Construction began in July 1976 and was completed in 1984.

Read more

The plant was never loaded with fuel. After the 1986 Chernobyl accident the new Aquino government mothballed it, amid concerns over its cost, alleged corruption in the contract and the site's earthquake risk. The country finished paying off the plant's debt in 2007.

Built but never operated