2 units: 2 operational.
Net capacity in service: 2,620 MWe.
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Belleville 1 | PWR | P4 REP 1300 | 1,310 | 1980-05-01 | 1987-10-14 | 1988-06-01 | Operational | |
| Belleville 2 | PWR | P4 REP 1300 | 1,310 | 1980-08-01 | 1988-07-06 | 1989-01-01 | Operational |
Capacity, milestones and suppliers
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Belleville 1 | 1,310 | 1,363 | 3,817 | 1987-09-09 | FRAMATOME | ALSTOM | |
| Belleville 2 | 1,310 | 1,363 | 3,817 | 1988-05-25 | FRAMATOME | ALSTOM |
Lifetime performance, through 2025
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Belleville 1 | 308.1 TWh | 70.8% | 75.3% | 77.4% |
| Belleville 2 | 305.8 TWh | 71.4% | 76.3% | 78.5% |
Operator: ÉLECTRICITÉ DE FRANCE
Owner: ÉLECTRICITÉ DE FRANCE
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$220
Lodging/Night
$132
M&IE/Day
$352
Total/Day
France: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
47.5104, 2.87425
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Belleville Nuclear Power Plant.
Belleville is a nuclear power plant at Belleville-sur-Loire in the Cher department of Centre-Val de Loire, France, on the Loire River.
Read more
Construction of Unit 1 began on 1 May 1980 and Unit 2 on 1 August 1980. Both units are 1,300 MWe pressurized water reactors of the P4 series, supplied by Framatome. Unit 1 was connected to the grid on 14 October 1987 and Unit 2 on 6 July 1988. They entered commercial operation in June 1988 and January 1989.