Belleville

Technical specifications, photos, nearby jobs, and satellite map for Belleville.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
2 units: 2 operational. Net capacity in service: 2,620 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Belleville 1 PWR P4 REP 1300 1,310 1980-05-01 1987-10-14 1988-06-01 Operational
Belleville 2 PWR P4 REP 1300 1,310 1980-08-01 1988-07-06 1989-01-01 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Belleville 1 1,310 1,363 3,817 1987-09-09 FRAMATOME ALSTOM
Belleville 2 1,310 1,363 3,817 1988-05-25 FRAMATOME ALSTOM
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Belleville 1 308.1 TWh 70.8% 75.3% 77.4%
Belleville 2 305.8 TWh 71.4% 76.3% 78.5%
Operator: ÉLECTRICITÉ DE FRANCE
Owner: ÉLECTRICITÉ DE FRANCE
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$220
Lodging/Night
$132
M&IE/Day
$352
Total/Day
France: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Belleville-sur-Loire, Centre-Val de Loire, France
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Belleville Nuclear Power Plant.

Belleville is a nuclear power plant at Belleville-sur-Loire in the Cher department of Centre-Val de Loire, France, on the Loire River.

Read more

Construction of Unit 1 began on 1 May 1980 and Unit 2 on 1 August 1980. Both units are 1,300 MWe pressurized water reactors of the P4 series, supplied by Framatome. Unit 1 was connected to the grid on 14 October 1987 and Unit 2 on 6 July 1988. They entered commercial operation in June 1988 and January 1989.