Big Rock Point

DECON

Holtec International·Charlevoix, MI·BWR·67 MWe

Community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Big Rock Point.

DECON

Permanently shut down on 1997-08-29.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Big Rock Point BWR - 67 1960-05-01 1962-12-08 1963-03-29 1997-08-29 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Big Rock Point 72 71 240 1962-09-27 GENERAL ELECTRIC CO. GENERAL ELECTRIC CO.
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Big Rock Point 12.7 TWh 64.1% 74.9% 73.1%
Operator: CONSUMERS POWER CO.
Owner: CONSUMERS POWER CO.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-14.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Big Rock Point NPP Site (shutdown) ISFSI AFR Dry Spent Fuel Storage Commercial 0 t HM In Operation Entergy Nuclear Operations, Inc
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$113
Lodging/Night
$68
M&IE/Day
$181
Total/Day
Standard Rate, MI

Unemployment Benefits MI

?
Maximum state unemployment insurance benefits for MI. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$530
Max Weekly
26
Max Weeks
$13,780
Max Total

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
10269 US 31 North
Charlevoix, MI 49720, USA
Get Directions
Phone: (616) 547-6537

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Big Rock Point Nuclear Power Plant.

Big Rock Point was a small nuclear power plant in Hayes Township, Charlevoix County, Michigan, on the shore of Lake Michigan near Charlevoix. Consumers Power built it with a General Electric boiling water reactor, and Bechtel was the primary contractor.

Read more

Groundbreaking took place in 1960. The reactor went critical on September 27, 1962, and was first connected to the grid on December 8, 1962. From 1971 to 1982 it produced cobalt-60 for medical use. The American Nuclear Society named it a Nuclear Historic Landmark in 1991. Consumers Power decided in January 1997 to close it, and the reactor made its final scram on August 29, 1997. The reactor vessel was removed on August 25, 2003, and shipped to Barnwell, South Carolina, that October.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Holtec International
Architect Engineer: BECH
Constructor: BECH
Publicly Traded No — Privately held

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-DRYAMB
NSS Supplier: GE 1
Thermal Power: 240 MWt
Net Capacity: 67 MWe
Status: DECON

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000155
License #: DPR-6
License Type: OL-FP
Const. Permit: 1960-05-31
Operating Lic: 1964-05-01
Commercial Op: 1963-03-29
License Exp: 2000-05-31