Reactor Units
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 operational.
Net capacity in service: 3,210 MWe.
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Bruce 2 | PHWR | CANDU 791 | 817 | 1970-12-01 | 1976-09-04 | 1977-09-01 | Operational | |
| Bruce 1 | PHWR | CANDU 791 | 816 | 1971-06-01 | 1977-01-14 | 1977-09-01 | Operational | |
| Bruce 3 | PHWR | CANDU 750A | 770 | 1972-07-01 | 1977-12-12 | 1978-02-01 | Operational | |
| Bruce 4 | PHWR | CANDU 750A | 807 | 1972-09-01 | 1978-12-21 | 1979-01-18 | Operational |
Capacity, milestones and suppliers
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Bruce 2 | 732 | 880 | 2,620 | 1976-07-27 | ONTARIO HYDRO / ATOMIC ENERGY OF CANADA, LTD. | NEI PARSONS | Suspended 1995-10-08; Restarted 2012-10-16 |
| Bruce 1 | 732 | 880 | 2,620 | 1976-12-17 | ONTARIO HYDRO / ATOMIC ENERGY OF CANADA, LTD. | NEI PARSONS | Suspended 1997-10-16; Restarted 2012-09-19 |
| Bruce 3 | 750 | 865 | 2,550 | 1977-11-28 | ONTARIO HYDRO / ATOMIC ENERGY OF CANADA, LTD. | NEI PARSONS | Suspended 1998-04-01; Restarted 2004-01-08 |
| Bruce 4 | 750 | 865 | 2,550 | 1978-12-10 | ONTARIO HYDRO / ATOMIC ENERGY OF CANADA, LTD. | NEI PARSONS | Suspended 1998-03-16; Restarted 2003-10-07 |
Lifetime performance, through 2025
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Bruce 2 | 155.5 TWh | 72.0% | 72.3% | 78.1% |
| Bruce 1 | 172.5 TWh | 74.5% | 74.7% | 82.1% |
| Bruce 3 | 187.1 TWh | 69.5% | 69.3% | 74.3% |
| Bruce 4 | 197.5 TWh | 73.4% | 73.6% | 78.2% |
Operator: Bruce Power
Owner: Ontario Power Generation
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-14.
Fuel Cycle Facilities
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
4 facilities: 1 decommissioned, 1 decommissioning, 2 others.
| Facility | Type | Scale | Design Capacity | Operated | Status | Operator |
|---|---|---|---|---|---|---|
| BHWP - A | Heavy Water Production | Commercial | 800 t/year | 1973–1984 | Decommissioned | Bruce Heavy Water Plant, Ontario Hydro |
| BHWP - B | Heavy Water Production | Commercial | 800 t/year | 1979–1997 | Decommissioning | Ontario Power Generation |
| BHWP - C | Heavy Water Production | Commercial | 800 t/year | Others | Ontario Power Generation | |
| BHWP - D | Heavy Water Production | Commercial | 800 t/year | Others | Ontario Power Generation |
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$167
Lodging/Night
$120
M&IE/Day
$287
Total/Day
Canada: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
44.3393, -81.5744
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
NukeWorker Member Ratings 13 votes
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Score uses a Bayesian average that accounts for vote count — facilities with few votes are pulled toward the fleet average, so rankings reflect confidence, not just raw percentages.
Above Average
11 (84%)
Average
1 (7%)
Below Average
1 (7%)
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Bruce Nuclear Generating Station.
Bruce is a nuclear power station on the eastern shore of Lake Huron near Kincardine and Tiverton, in Bruce County, Ontario, covering about 932 hectares.
Read more
Ontario Hydro built it in stages between 1970 and 1987 as two four-unit plants, Bruce A (Units 1 to 4) and Bruce B (Units 5 to 8). All eight units are CANDU pressurized heavy-water reactors supplied by AECL. Unit 2 reached the grid on 4 September 1976 and Unit 8 on 7 March 1987. Unit 2 was taken offline in 1995 and Unit 1 in 1997, and Units 3 and 4 were idle from 1998. Unit 4 returned in October 2003 and Unit 3 in January 2004, and Units 1 and 2 were back on the grid in 2012.
Technical Specs
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: