Cernavoda

Technical specifications, photos, nearby jobs, and satellite map for Cernavoda.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
2 units: 2 operational. Net capacity in service: 1,300 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Cernavoda 1 PHWR CANDU 6 650 1983-03-31 1996-07-11 1996-12-02 Operational
Cernavoda 2 PHWR CANDU 6 650 1983-07-01 2007-08-07 2007-11-01 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Cernavoda 1 650 706 2,180 1996-04-16 ATOMIC ENERGY OF CANADA, LTD. General Electric
Cernavoda 2 650 705 2,180 2007-05-06 ATOMIC ENERGY OF CANADA, LTD. General Electric
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Cernavoda 1 149.8 TWh 89.7% 89.5% 91.4%
Cernavoda 2 97.3 TWh 93.3% 93.3% 94.7%
Operator: SOCIETATEA NATIONALA NUCLEARELECTRICA, S.A.
Owner: Ministerul Economiei, Comertului si mediului de Afaceri
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-26.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Dry Storage Facility (WRMG) AFR Dry Spent Fuel Storage Commercial 108000 Bundle/year 2003– In Operation Cernavoda NPP
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$137
Lodging/Night
$108
M&IE/Day
$245
Total/Day
Romania: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Cernavoda, Constanța, Romania
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Cernavoda Nuclear Power Plant; IAEA PRIS: Romania.

The Cernavoda nuclear power plant is on the Danube at Cernavoda in Constanta County, in southeastern Romania. Its first two units are CANDU 6 heavy-water reactors supplied by Atomic Energy of Canada Limited.

Read more

Construction of Unit 1 began on July 1, 1982, and Unit 2 on July 1, 1983. Work on three further partly built units was halted on December 1, 1990, after the fall of the Ceausescu government. Unit 1 was connected to the grid on July 11, 1996, and entered commercial operation on December 2, 1996. Unit 2 reached criticality on May 6, 2007, and was connected to the grid on August 7, 2007.