Chasnupp

Technical specifications, photos, nearby jobs, and satellite map for Chasnupp.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
5 units: 4 operational, 1 under construction. Net capacity in service: 1,228 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
CHASNUPP 1 PWR CNP-300 300 1993-08-01 2000-06-13 2000-09-15 Operational
CHASNUPP 2 PWR CNP-300 300 2005-12-28 2011-03-14 2011-05-18 Operational
CHASNUPP 3 PWR CNP-300 315 2011-05-28 2016-10-15 2016-12-06 Operational
CHASNUPP 4 PWR CNP-300 313 2011-12-18 2017-06-25 2017-09-19 Operational
CHASNUPP 5 PWR Hualong-1 1,117 2024-12-30 Under Construction
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
CHASNUPP 1 300 325 999 2000-05-03 CHINA NATIONAL NUCLEAR CORPORATION Shanghai Turbine Works
CHASNUPP 2 300 325 999 2011-02-22 CHINA NATIONAL NUCLEAR CORPORATION Shanghai Turbine Co.
CHASNUPP 3 315 340 999 2016-08-01 CHINA NATIONAL NUCLEAR CORPORATION Shanghai Turbine Co.
CHASNUPP 4 313 340 999 2017-03-15 CHINA NATIONAL NUCLEAR CORPORATION Shanghai Turbine Co.
CHASNUPP 5 1,117 1,200 3,180 CHINA NATIONAL NUCLEAR CORPORATION CHINA NATIONAL NUCLEAR CORPORATION
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
CHASNUPP 1 52.2 TWh 78.1% 79.0% 81.0%
CHASNUPP 2 33.6 TWh 86.8% 86.1% 87.8%
CHASNUPP 3 21.8 TWh 86.4% 88.3% 90.5%
CHASNUPP 4 19.6 TWh 85.6% 88.5% 88.6%
Operator: PAKISTAN ATOMIC ENERGY COMMISSION
Owner: PAKISTAN ATOMIC ENERGY COMMISSION
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$177
Lodging/Night
$82
M&IE/Day
$259
Total/Day
Pakistan: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Kundian, Punjab, Pakistan
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Chashma Nuclear Power Complex; IAEA PRIS: Pakistan.

Chasnupp (Chashma Nuclear Power Complex) is a group of pressurized water reactors at Chashma in Mianwali District, Punjab, Pakistan, on the Indus River. The first four units are Chinese CNP-300 reactors supplied by the China National Nuclear Corporation.

Read more

Construction of Unit 1 began on August 1, 1993, and it was connected to the grid on June 13, 2000. Unit 2 began construction in December 2005 and reached the grid on March 14, 2011. Units 3 and 4 began construction in 2011. Unit 3 was connected to the grid on October 15, 2016, and Unit 4 on June 25, 2017. A fifth unit, a Hualong One design, had its groundbreaking in July 2023.