Chernobyl

Technical specifications, photos, nearby jobs, and satellite map for Chernobyl.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Chornobyl 1 LWGR RBMK 740 1970-03-01 1977-09-26 1978-05-27 1996-11-30 Permanent Shutdown
Chornobyl 2 LWGR RBMK 925 1973-02-01 1978-12-21 1979-05-28 1991-10-11 Permanent Shutdown
Chornobyl 3 LWGR RBMK 925 1976-03-01 1981-12-03 1982-06-08 2000-12-15 Permanent Shutdown
Chornobyl 4 LWGR RBMK 925 1979-04-01 1983-12-22 1984-03-26 1986-04-26 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Chornobyl 1 925 800 3,200 1977-08-02 Federal Atomic Energy Agency Federal Atomic Energy Agency
Chornobyl 2 925 1,000 3,200 1978-11-17 Federal Atomic Energy Agency Federal Atomic Energy Agency
Chornobyl 3 925 1,000 3,200 1981-06-02 Federal Atomic Energy Agency Federal Atomic Energy Agency
Chornobyl 4 925 1,000 3,200 1983-11-26 Federal Atomic Energy Agency Federal Atomic Energy Agency
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Chornobyl 1 97.3 TWh 64.3% 63.1% 75.3%
Chornobyl 2 76.0 TWh 66.5% 67.7% 79.8%
Chornobyl 3 98.0 TWh 63.6% 67.0% 67.1%
Operator: MINTOPENERGO OF UKRAINE - MINISTRY OF FUEL AND ENERGY OF UKRAINE
Owner: SE “NNEGC “ENERGOATOM”
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
3 facilities: 2 in operation, 1 others.
Facility Type Scale Design Capacity Operated Status Operator
Chernobyl NPP Site AFR Wet Spent Fuel Storage (Pool) Commercial 2518 t HM 1986–2025 In Operation National Nuclear Energy Generating Company
Centralised spent fuel storage facility AFR Dry Spent Fuel Storage Commercial 16529 Elements/year 2023– In Operation National nuclear energy generating co. "Energoatom"
Chernobyl NPP Site AFR Dry Spent Fuel Storage Commercial 21350 Cask-Bund. 2004– Others National Nuclear Energy Generating Company
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$140
Lodging/Night
$97
M&IE/Day
$237
Total/Day
Ukraine: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Pripyat, Kyiv Oblast, Ukraine
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Chernobyl Nuclear Power Plant; IAEA PRIS: Ukraine.

The Chernobyl nuclear power plant stands near the city of Pripyat in Kyiv Oblast, Ukraine, about 100 km north of Kyiv. It had four RBMK-1000 graphite-moderated reactors of Soviet design.

Read more

Construction began on August 15, 1972. Unit 1 was connected to the grid on September 26, 1977, Unit 2 on December 21, 1978, Unit 3 on December 3, 1981, and Unit 4 on December 22, 1983. On April 26, 1986, Unit 4 exploded and burned in the Chernobyl accident. Unit 2 was shut down after a turbine fire on October 11, 1991, Unit 1 on November 30, 1996, and Unit 3 on December 15, 2000. A large arch, the New Safe Confinement, was placed over the damaged unit in November 2016.