Cofrentes

Technical specifications, photos, nearby jobs, and satellite map for Cofrentes.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 operational. Net capacity in service: 1,064 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Cofrentes BWR BWR-6 (Mark 3) 1,064 1975-09-09 1984-10-14 1985-03-11 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Cofrentes 939 1,102 3,237 1984-08-23 GENERAL ELECTRIC CO. GENERAL ELECTRIC CO.
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Cofrentes 318.1 TWh 87.0% 87.5% 90.0%
Operator: IBERDROLA, S.A.
Owner: IBERDROLA, S.A.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$246
Lodging/Night
$146
M&IE/Day
$392
Total/Day
Spain: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Cofrentes, Valencian Community, Spain
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Cofrentes Nuclear Power Plant.

Cofrentes is a nuclear power plant about 2 km southeast of the town of Cofrentes in the Valencian Community, Spain, on the right flank of the Júcar River, roughly 61 km from Valencia in a straight line.

Read more

The project began in March 1973 with contracts to General Electric for the reactor, turbogenerator and first fuel load. Construction started in 1975. The plant has a single General Electric boiling water reactor of the BWR-6 model, and it was first connected to the grid on 14 October 1984.