Cruas

Technical specifications, photos, nearby jobs, and satellite map for Cruas.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 operational. Net capacity in service: 3,660 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Cruas 1 PWR CP2 915 1978-08-01 1983-04-29 1984-04-02 Operational
Cruas 3 PWR CP2 915 1979-04-15 1984-05-14 1984-09-10 Operational
Cruas 2 PWR CP2 915 1978-11-15 1984-09-06 1985-04-01 Operational
Cruas 4 PWR CP2 915 1979-10-01 1984-10-27 1985-02-11 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Cruas 1 880 956 2,785 1983-04-02 FRAMATOME ALSTOM
Cruas 3 880 956 2,785 1984-04-09 FRAMATOME ALSTOM
Cruas 2 915 956 2,785 1984-08-01 FRAMATOME ALSTOM
Cruas 4 880 956 2,785 1984-10-01 FRAMATOME ALSTOM
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Cruas 1 234.8 TWh 70.3% 75.3% 76.6%
Cruas 3 234.4 TWh 71.1% 76.1% 77.7%
Cruas 2 238.1 TWh 72.4% 76.7% 79.3%
Cruas 4 232.5 TWh 70.9% 74.9% 76.3%
Operator: ÉLECTRICITÉ DE FRANCE
Owner: ÉLECTRICITÉ DE FRANCE
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$220
Lodging/Night
$132
M&IE/Day
$352
Total/Day
France: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Cruas, Auvergne-Rhône-Alpes, France
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Cruas Nuclear Power Plant.

Cruas is a nuclear power plant on the Rhône river, in the communes of Cruas and Meysse in the Ardèche department, in the Auvergne-Rhône-Alpes region of France. It is about 35 km north of the Tricastin site and has four pressurized water reactor units supplied by Framatome.

Read more

Construction began in 1978, and the units were first connected to the grid between April 1983 and October 1984. On 1 December 2009, unit 4 was shut down after vegetation blocked its cooling water intake, an event rated level 2 on the International Nuclear Event Scale. On 11 November 2019, a magnitude 4.8 earthquake in the Ardèche led to a halt in production for inspections.