Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
Active nuclear industry job listings in SC from the NukeWorker job board. Click a job title for full details, or click the header to search all jobs in this state.
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
Maximum state unemployment insurance benefits for SC. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
34.2625, -81.3292
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Carolinas-Virginia Tube Reactor.
The Carolinas-Virginia Tube Reactor (CVTR) was a small pressurized heavy-water test reactor at Parr, Fairfield County, South Carolina, on a bluff northeast of the Parr Reservoir across the Broad River. It was built by Carolinas Virginia Nuclear Power Associates, a group of Carolina Power & Light, Duke Power, South Carolina Electric & Gas and Virginia Electric and Power. Westinghouse supplied the nuclear systems.
Read more
The site was approved in January 1959, and construction began on January 1, 1960. The reactor first went critical on March 30, 1963, and was connected to the grid on December 18, 1963. It was shut down on January 10, 1967, after completing its planned test program. Demolition was finished by the fall of 2009, and the site was returned to greenfield condition.
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Dominion Energy and NextEra Energy (NEE) announced a merger on 2026-05-18. It is still subject to regulatory and shareholder approval, so Dominion remains the owner of record here until the deal closes.
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.