Breaker-to-Breaker Runs
12 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Diablo Canyon 1 has logged 12 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 598 days, and its runs average 520 days.
598
Best Run (days)
1R20 (2017-06-22) → 1R21 (2019-02-10)
★ 6-run breaker-to-breaker
1R19 → 1R20 → 1R21 → 1R22 → 1R23 → 1R24 → 1R25
All Runs
| 2023-12-17 |
2025-04-13 |
483 days |
1R24 → 1R25 |
| 2022-04-22 |
2023-10-01 |
527 days |
1R23 → 1R24 |
| 2020-11-02 |
2022-03-27 |
510 days |
1R22 → 1R23 |
| 2019-03-17 |
2020-10-04 |
567 days |
1R21 → 1R22 |
| 2017-06-22 |
2019-02-10 |
598 days |
1R20 → 1R21 |
| 2015-11-08 |
2017-04-23 |
532 days |
1R19 → 1R20 |
| 2010-11-11 |
2012-04-23 |
529 days |
1R16 → 1R17 |
| 2007-08-16 |
2009-01-26 |
529 days |
1R14 → 1R15 |
| 2005-11-30 |
2007-05-01 |
517 days |
1R13 → 1R14 |
| 2004-07-24 |
2005-10-24 |
457 days |
1R12 → 1R13 |
| 2002-12-12 |
2004-03-23 |
467 days |
1R11 → 1R12 |
| 2000-11-22 |
2002-04-29 |
523 days |
1R10 → 1R11 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Diablo Canyon Power Plant.
Diablo Canyon Power Plant is a two-unit nuclear station on the Pacific coast near Avila Beach, in San Luis Obispo County, California, on about 750 acres.
Read more
Pacific Gas and Electric began construction of Unit 1 on April 23, 1968, and Unit 2 on December 9, 1970. Both are Westinghouse four-loop pressurized water reactors. Unit 1 was first connected to the grid on November 11, 1984, and Unit 2 on October 20, 1985. The NRC approved the plant's safety in 1978. In 1981 about 1,900 protesters were arrested over two weeks, and in September 1981 PG&E found that one set of blueprints had been used for structural supports in both reactors.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Diablo Canyon 1 has operated for about 41.4 years and averaged a 90.2% lifetime capacity factor, generating roughly 246.4 TWh of electricity. Its longest unbroken run reached 667 days.
Lifecycle & Tenure
Operating Age: 41.4 Yrs
Build Time: 17 Yrs
Lic. Remaining: 38 Yrs
Production & Power
Lifetime CF: 90.2%
Efficiency: 32.9%
Generated: 246.4 TWh
Reliability & Outages
Record Run: 667 Days
Refuelings: 18
Avg Startup: 8.1 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
PCG
PG&E Corporation
NYSE
$12.97
▼ -0.19 (-1.41%)
Previous Close
13.15
Day's Range
12.96 – 13.30
52-Week Range
11.77 – 19.16
Volume
20,002,245
Operational Excellence Score Subscribers
Diablo Canyon 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
1 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Diablo Canyon 1 has recorded 1 reactor scram, or emergency shutdown, since 2011 (0 automatic, 1 manual). On average the unit was back to full power about 49 days after each trip.
Recent Events
| 2023-09-30 |
Manual |
MANUAL REACTOR TRIP The following information was provided b... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power:
3411 MWt
Net Capacity:
1122 MWe
Gross Capacity:
1,197 MWe IAEA
Design Capacity:
1,084 MWe IAEA
Efficiency:
32.9%
Lifetime Output:
334.7 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000275
License #:
DPR-80
License Type:
OL-FP
Const. Permit:
1968-04-23
Construction Start:
1968-04-23 IAEA
Operating Lic:
1984-11-02
First Criticality:
1984-04-29 IAEA
Grid Connection:
1984-11-11 IAEA
Commercial Op:
1985-05-07
License Renewed:
2026-04-02
License Exp:
2064-11-02
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
WECC
— Western Electricity Coordinating Council
Census Region:
PACC
— Pacific Contiguous (OR, WA, CA)
Balancing Authority:
CISO
— California Independent System Operator (ISO/RTO)
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)