Fugen

Technical specifications, photos, nearby jobs, and satellite map for Fugen.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Fugen ATR HWLWR ATR 148 1972-05-10 1978-07-29 1979-03-20 2003-03-29 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Fugen ATR 148 165 557 1978-03-20 HITACHI, LTD. TOSHIBA CORPORATION
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Fugen ATR 8.5 TWh 61.9% 61.9% 63.7%
Operator: JAPAN ATOMIC ENERGY AGENCY
Owner: JAPAN ATOMIC ENERGY AGENCY
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$208
Lodging/Night
$107
M&IE/Day
$315
Total/Day
Japan: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Tsuruga, Fukui Prefecture, Japan
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Fugen Nuclear Power Plant.

Fugen was a demonstration Advanced Thermal Reactor, a heavy-water-moderated, light-water-cooled design, in the Myojin-cho district of Tsuruga, Fukui Prefecture, Japan.

Read more

Construction began on 10 May 1972. The reactor was connected to the grid on 29 July 1978, and the plant was formally commissioned in March 1979. A tritium leak was reported there in 1997. It was permanently shut down on 29 March 2003 and later entered decommissioning.