Fukushima Daiichi

Technical specifications, photos, nearby jobs, and satellite map for Fukushima Daiichi.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
6 units: 6 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Fukushima-Daiichi 1 BWR BWR-3 439 1967-07-25 1970-11-17 1971-03-26 2011-05-19 Permanent Shutdown
Fukushima-Daiichi 2 BWR BWR-4 760 1969-06-09 1973-12-24 1974-07-18 2011-05-19 Permanent Shutdown
Fukushima-Daiichi 3 BWR BWR-4 760 1970-12-28 1974-10-26 1976-03-27 2011-05-19 Permanent Shutdown
Fukushima-Daiichi 5 BWR BWR-4 760 1972-05-22 1977-09-22 1978-04-18 2013-12-17 Permanent Shutdown
Fukushima-Daiichi 4 BWR BWR-4 760 1973-02-12 1978-02-24 1978-10-12 2011-05-19 Permanent Shutdown
Fukushima-Daiichi 6 BWR BWR-5 1,067 1973-10-26 1979-05-04 1979-10-24 2013-12-17 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Fukushima-Daiichi 1 439 460 1,380 1970-10-10 GENERAL ELECTRIC CO. / GENERAL ELECTRIC TECHNICAL SERVICES CO. GENERAL ELECTRIC CO. / GENERAL ELECTRIC TECHNICAL SERVICES CO.
Fukushima-Daiichi 2 760 784 2,381 1973-05-10 GENERAL ELECTRIC CO. / TOSHIBA CORPORATION GENERAL ELECTRIC CO./ TOSHIBA CORPORATION / GENERAL ELECTRIC TECHNICAL SERVICES CO.
Fukushima-Daiichi 3 760 784 2,381 1974-09-06 TOSHIBA CORPORATION TOSHIBA CORPORATION
Fukushima-Daiichi 5 760 784 2,381 1977-08-26 TOSHIBA CORPORATION TOSHIBA CORPORATION
Fukushima-Daiichi 4 760 784 2,381 1978-01-28 HITACHI, LTD. HITACHI, LTD.
Fukushima-Daiichi 6 1,067 1,100 3,293 1979-03-09 GENERAL ELECTRIC CO. / TOSHIBA CORPORATION GENERAL ELECTRIC CO. / GENERAL ELECTRIC TECHNICAL SERVICES CO.
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Fukushima-Daiichi 1 82.4 TWh 53.3% 54.0% 56.1%
Fukushima-Daiichi 2 148.2 TWh 60.8% 61.5% 64.3%
Fukushima-Daiichi 3 155.9 TWh 65.3% 65.7% 67.6%
Fukushima-Daiichi 5 156.4 TWh 65.5% 65.8% 67.5%
Fukushima-Daiichi 4 154.3 TWh 70.0% 70.2% 71.8%
Fukushima-Daiichi 6 206.7 TWh 64.2% 64.4% 65.3%
Operator: Tokyo Electric Power Company Holdings, Inc.
Owner: Tokyo Electric Power Company Holdings, Inc.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-12.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
2 facilities: 2 others.
Facility Type Scale Design Capacity Operated Status Operator
Fukushima Daiichi NPP site SFSF AFR Dry Spent Fuel Storage Commercial 408 Cask-Bund. 1995– Others Tokyo Electric Power Company
Fukushima Daiichi NPP Site SFSF AFR Wet Spent Fuel Storage (Pool) Commercial 6840 Cask-Bund. 1997– Others Tokyo Electric Power Company
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$208
Lodging/Night
$107
M&IE/Day
$315
Total/Day
Japan: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Okuma, Fukushima Prefecture, Japan
Get Directions