Genkai

Technical specifications, photos, nearby jobs, and satellite map for Genkai.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 2 operational, 2 permanent shutdown. Net capacity in service: 2,254 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Genkai 1 PWR M (2-loop) 529 1971-09-15 1975-02-14 1975-10-15 2015-04-27 Permanent Shutdown
Genkai 2 PWR M (2-loop) 529 1977-02-01 1980-06-03 1981-03-30 2019-04-09 Permanent Shutdown
Genkai 3 PWR M (4-loop) 1,127 1988-06-01 1993-06-15 1994-03-18 Operational
Genkai 4 PWR M (4-loop) 1,127 1992-07-15 1996-11-12 1997-07-25 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Genkai 1 529 559 1,650 1975-01-28 MITSUBISHI HEAVY INDUSTRIES, LTD. MITSUBISHI HEAVY INDUSTRIES, LTD. Decommissioning from 2017-04-19
Genkai 2 529 559 1,650 1980-05-21 MITSUBISHI HEAVY INDUSTRIES, LTD. MITSUBISHI HEAVY INDUSTRIES, LTD. Decommissioning from 2020-03-18
Genkai 3 1,127 1,180 3,423 1993-05-28 MITSUBISHI HEAVY INDUSTRIES, LTD. MITSUBISHI HEAVY INDUSTRIES, LTD.
Genkai 4 1,127 1,180 3,423 1996-10-23 MITSUBISHI HEAVY INDUSTRIES, LTD. MITSUBISHI HEAVY INDUSTRIES, LTD.
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Genkai 1 127.7 TWh 68.4% 67.7% 69.0%
Genkai 2 118.2 TWh 64.5% 63.7% 64.2%
Genkai 3 209.8 TWh 64.8% 63.7% 64.0%
Genkai 4 186.4 TWh 65.6% 64.7% 65.0%
Operator: Kyushu Electric Power Co., Inc.
Owner: Kyushu Electric Power Co., Inc.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$208
Lodging/Night
$107
M&IE/Day
$315
Total/Day
Japan: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Genkai, Saga Prefecture, Japan
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Genkai Nuclear Power Plant.

Genkai Nuclear Power Plant is in the town of Genkai, Higashimatsuura District, Saga Prefecture, on the island of Kyushu, Japan.

Read more

Construction began on 15 September 1971. All four units are pressurized water reactors supplied by Mitsubishi Heavy Industries. Unit 1 was connected to the grid on 14 February 1975, Unit 2 on 3 June 1980, Unit 3 on 15 June 1993 and Unit 4 on 12 November 1996. Unit 1 was permanently shut down on 27 April 2015 and Unit 2 on 9 April 2019.