Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Hallam SGR LMGMR (SGR- Sodium cooled graphite moderated reactor) 75 1959-01-01 1963-09-01 1963-11-01 1964-09-01 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Hallam 75 84 256 1963-01-01 GENERAL ELECTRIC CO. GENERAL ELECTRIC CO.
Operator: Atomic Energy Commission and Nebraska Public Power District
Owner: HALLAM Nucler Power Facility
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$113
Lodging/Night
$68
M&IE/Day
$181
Total/Day
Standard Rate, NE

Unemployment Benefits NE

?
Maximum state unemployment insurance benefits for NE. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$526
Max Weekly
26
Max Weeks
$13,676
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
4500 W. Pella Road
Hallam, NE 68368, USA
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Hallam Nuclear Power Facility.

The Hallam Nuclear Power Facility was a power reactor near Hallam, Nebraska, in Lancaster County, about 25 miles southwest of Lincoln. Atomics International designed it as a 75 MWe sodium-cooled, graphite-moderated reactor.

Read more

Construction began on April 1, 1959. The reactor first went critical in January 1962 and connected to the grid in September 1963. Seven moderator elements ruptured in February 1964, and the reactor was shut down in September 1964. The Atomic Energy Commission announced its decommissioning in June 1966. Work was completed in 1969, with the below-ground reactor components entombed on site.