Higashidori

Technical specifications, photos, nearby jobs, and satellite map for Higashidori.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 suspended operation. Net capacity in service: 1,067 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Higashi Dori-1 (Tohoku) BWR BWR-5 1,067 2000-11-07 2005-03-09 2005-12-08 Suspended Operation
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Higashi Dori-1 (Tohoku) 1,067 1,100 3,293 2005-01-24 TOSHIBA CORPORATION TOSHIBA CORPORATION Suspended 2011-03-11
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Higashi Dori-1 (Tohoku) 41.9 TWh 79.4% 79.9% 80.2%
Operator: Tohoku Electric Power Co., Inc
Owner: Tohoku Electric Power Co., Inc
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$208
Lodging/Night
$107
M&IE/Day
$315
Total/Day
Japan: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Higashidori, Aomori Prefecture, Japan
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Higashidori Nuclear Power Plant.

Higashidori Nuclear Power Plant is at Higashidori, on the Shimokita Peninsula in Aomori Prefecture, Japan, facing the Pacific Ocean.

Read more

Tohoku Electric began construction of its Unit 1 in November 2000. The boiling water reactor, of Toshiba design and based on the Onagawa Unit 3 design, was connected to the grid on 9 March 2005 and entered commercial operation in December 2005. Tokyo Electric started preparatory construction of a separate advanced boiling water reactor unit at the site on 25 January 2011.