Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Jose Cabrera 1 | PWR | WH 1LP | 141 | 1964-06-24 | 1968-07-14 | 1969-08-13 | 2006-04-30 | Permanent Shutdown |
Capacity, milestones and suppliers
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Jose Cabrera 1 | 153 | 150 | 510 | 1968-06-30 | WESTINGHOUSE ELECTRIC CORPORATION | WESTINGHOUSE ELECTRIC CORPORATION |
Lifetime performance, through 2025
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Jose Cabrera 1 | 34.6 TWh | 69.6% | 72.3% | 78.9% |
Operator: UNION FENOSA GENERATION, S.A.
Owner: UNION FENOSA GENERATION, S.A.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.
Fuel Cycle Facilities
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
| Facility | Type | Scale | Design Capacity | Operated | Status | Operator |
|---|---|---|---|---|---|---|
| AFR dry storage facility-Jose Cabrera NPP | AFR Dry Spent Fuel Storage | Commercial | 100 t HM | 2021– | In Operation |
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$246
Lodging/Night
$146
M&IE/Day
$392
Total/Day
Spain: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
40.349, -2.8853
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Jos%C3%A9 Cabrera Nuclear Power Plant.
José Cabrera is a nuclear power plant at Almonacid de Zorita, in Castile-La Mancha, Spain, about 70 km east of Madrid.
Read more
Construction began in 1964. The plant had a single-loop Westinghouse pressurized water reactor of about 160 MWe. It was connected to the grid on 14 July 1968. A ministerial order closed it in 2006, and it was permanently shut down on 30 April 2006. Westinghouse won contracts to dismantle the reactor internals in 2010 and the reactor pressure vessel in 2013, and dismantling of the containment building began in November 2019.