Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 operational.
Net capacity in service: 3,800 MWe.
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Kalinin 1 | PWR | VVER V-338 | 950 | 1977-02-01 | 1984-05-09 | 1984-06-28 | Operational | |
| Kalinin 2 | PWR | VVER V-338 | 950 | 1982-02-01 | 1986-12-11 | 1986-12-25 | Operational | |
| Kalinin 3 | PWR | VVER V-320 | 950 | 1985-10-01 | 2004-12-16 | 2005-11-08 | Operational | |
| Kalinin 4 | PWR | VVER V-320 | 950 | 1986-08-01 | 2011-11-24 | 2012-09-25 | Operational |
Capacity, milestones and suppliers
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Kalinin 1 | 950 | 1,000 | 3,120 | 1984-04-10 | Atomenergomash | Kharkiv Turbine Factory | |
| Kalinin 2 | 950 | 1,000 | 3,120 | 1986-11-25 | Atomenergomash | Kharkiv Turbine Factory | |
| Kalinin 3 | 949 | 1,000 | 3,120 | 2004-11-26 | Atomenergomash | Federal Atomic Energy Agency | |
| Kalinin 4 | 933 | 1,000 | 3,120 | 2011-11-08 | Atomenergomash | Kharkiv Turbine Factory |
Lifetime performance, through 2025
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Kalinin 1 | 265.1 TWh | 76.7% | 75.8% | 77.5% |
| Kalinin 2 | 266.5 TWh | 82.0% | 79.1% | 83.9% |
| Kalinin 3 | 150.0 TWh | 87.5% | 85.1% | 85.6% |
| Kalinin 4 | 106.1 TWh | 93.2% | 89.9% | 90.3% |
Operator: Joint Stock Company 'Concern Rosenergoatom'
Owner: Joint Stock Company 'Concern Rosenergoatom'
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$173
Lodging/Night
$112
M&IE/Day
$285
Total/Day
Russia: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
57.9043, 35.0609
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Kalinin Nuclear Power Plant; IAEA PRIS: Russian Federation.
The Kalinin nuclear power plant is in Tver Oblast, Russia, near the town of Udomlya, about 200 km northwest of Moscow. It has four VVER-1000 pressurized water reactors.
Read more
Construction of Unit 1 began on February 1, 1977. Unit 1 was connected to the grid on May 9, 1984, and entered commercial operation in June 1985. Unit 2 followed on the grid on December 11, 1986. Work on Units 3 and 4 began in 1985 and 1986, and they were connected to the grid on December 16, 2004, and November 24, 2011.