Kanupp

Technical specifications, photos, nearby jobs, and satellite map for Kanupp.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
3 units: 2 operational, 1 permanent shutdown. Net capacity in service: 2,034 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
KANUPP 1 PHWR CANDU-137 MW 90 1966-08-01 1971-10-18 1972-12-07 2021-08-01 Permanent Shutdown
KANUPP 2 PWR ACP-1000 1,017 2015-08-20 2021-03-18 2021-05-21 Operational
KANUPP 3 PWR ACP-1000 1,017 2016-05-31 2022-03-04 2022-04-18 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
KANUPP 1 125 100 337 1971-08-01 CANADIAN GENERAL ELECTRIC HITACHI, LTD.
KANUPP 2 1,017 1,100 3,060 2021-02-28 China Zhongyuan Engineering Corporation Shanghai Turbine Co.
KANUPP 3 1,014 1,100 3,060 2022-02-21 China Zhongyuan Engineering Corporation Shanghai Turbine Co.
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
KANUPP 1 14.9 TWh 29.5% 31.7% 55.5%
KANUPP 2 33.2 TWh 78.6% 81.8% 84.1%
KANUPP 3 26.6 TWh 79.0% 86.1% 85.9%
Operator: PAKISTAN ATOMIC ENERGY COMMISSION
Owner: PAKISTAN ATOMIC ENERGY COMMISSION
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$177
Lodging/Night
$102
M&IE/Day
$279
Total/Day
Karachi, Pakistan
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Karachi, Sindh, Pakistan
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Karachi Nuclear Power Plant; IAEA PRIS: Pakistan.

Kanupp (Karachi Nuclear Power Plant) stands at Paradise Point on the Arabian Sea coast of Karachi, Sindh, Pakistan. The first unit was a CANDU heavy-water reactor designed by Canadian General Electric, under a contract signed in 1965.

Read more

Construction of KANUPP 1 began on August 1, 1966. It reached criticality on August 1, 1971, and was connected to the grid in 1971. It was permanently shut down on August 1, 2021. Two Chinese-designed Hualong One pressurized water reactors, KANUPP 2 and 3, began construction on August 20, 2015, and May 31, 2016. They were connected to the grid on March 18, 2021, and March 4, 2022.