Khmelnitskiy

Technical specifications, photos, nearby jobs, and satellite map for Khmelnitskiy.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 2 operational, 2 under construction. Net capacity in service: 1,900 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Khmelnytskyi 3 PWR VVER 1,035 1986-03-01 Under Construction
Khmelnytskyi 4 PWR VVER 1,035 1987-02-01 Under Construction
Khmelnytskyi 1 PWR VVER V-320 950 1981-11-01 1987-12-31 1988-08-13 Operational
Khmelnytskyi 2 PWR VVER V-320 950 1985-02-01 2004-08-07 2005-12-15 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Khmelnytskyi 3 1,035 1,089 3,132 JSC "Atomstroyexport" ŠKODA CONCERN NUCLEAR POWER PLANT WORKS
Khmelnytskyi 4 1,035 1,089 3,132 JSC "Atomstroyexport" ŠKODA CONCERN NUCLEAR POWER PLANT WORKS
Khmelnytskyi 1 950 1,000 3,000 1987-12-10 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA JOINT-STOCK COMPANY "LENINGRADSKIY METALLICHESKIY ZAVOD"
Khmelnytskyi 2 950 1,000 3,000 2004-08-01 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA JOINT-STOCK COMPANY "LENINGRADSKIY METALLICHESKIY ZAVOD"
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Khmelnytskyi 1 193.4 TWh 71.1% 71.4% 74.0%
Khmelnytskyi 2 110.2 TWh 77.3% 78.2% 80.0%
Operator: State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
Owner: SE “NNEGC “ENERGOATOM”; State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-26.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$140
Lodging/Night
$97
M&IE/Day
$237
Total/Day
Ukraine: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Netishyn, Khmelnytskyi Oblast, Ukraine
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Khmelnytskyi Nuclear Power Plant; IAEA PRIS: Ukraine.

The Khmelnytskyi nuclear power plant is at Netishyn in Khmelnytskyi Oblast, Ukraine. It was built with Soviet-designed pressurized water reactors.

Read more

Construction of Unit 1 began in 1981 and Unit 2 in 1983, while Soviet rule was in place. Unit 1 was connected to the grid on December 31, 1987. Work on Units 2 to 4 was halted in 1990 under a moratorium that followed the Chernobyl accident. Units 3 and 4, begun in September 1985 and June 1986, were not completed at that time. Unit 2 was completed after the moratorium was lifted and was connected to the grid on August 7, 2004.