Kozloduy

Technical specifications, photos, nearby jobs, and satellite map for Kozloduy.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
6 units: 2 operational, 4 permanent shutdown. Net capacity in service: 2,006 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Kozloduy 1 PWR VVER V-230 408 1970-04-01 1974-07-24 1974-10-28 2002-12-31 Permanent Shutdown
Kozloduy 2 PWR VVER V-230 408 1970-04-01 1975-08-24 1975-11-10 2002-12-31 Permanent Shutdown
Kozloduy 3 PWR VVER V-230 408 1973-10-01 1980-12-17 1981-01-20 2006-12-31 Permanent Shutdown
Kozloduy 4 PWR VVER V-230 408 1973-10-01 1982-05-17 1982-06-20 2006-12-31 Permanent Shutdown
Kozloduy 5 PWR VVER V-320 1,003 1980-07-09 1987-11-29 1988-12-23 Operational
Kozloduy 6 PWR VVER V-320 1,003 1982-04-01 1991-08-02 1993-12-30 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Kozloduy 1 408 440 1,375 1974-06-30 ATOMENERGOEXPORT ATOMENERGOEXPORT Decommissioning from 2010-01-01; Decommissioned 2032-12-31
Kozloduy 2 408 440 1,375 1975-08-22 ATOMENERGOEXPORT ATOMENERGOEXPORT Decommissioned 2032-12-31
Kozloduy 3 408 440 1,375 1980-12-04 ATOMENERGOEXPORT ATOMENERGOEXPORT Decommissioning from 2012-01-01; Decommissioned 2032-12-31
Kozloduy 4 408 440 1,375 1982-04-25 ATOMENERGOEXPORT ATOMENERGOEXPORT Decommissioning from 2012-01-01; Decommissioned 2032-12-31
Kozloduy 5 953 1,040 3,120 1987-11-05 ATOMENERGOEXPORT ATOMENERGOEXPORT
Kozloduy 6 953 1,040 3,120 1991-05-29 ATOMENERGOEXPORT ATOMENERGOEXPORT
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Kozloduy 1 61.1 TWh 60.1% 66.9% 73.0%
Kozloduy 2 62.8 TWh 64.4% 71.4% 79.1%
Kozloduy 3 62.8 TWh 67.4% 75.6% 81.4%
Kozloduy 4 61.0 TWh 69.2% 75.2% 82.6%
Kozloduy 5 219.8 TWh 69.5% 74.6% 76.9%
Kozloduy 6 204.7 TWh 75.0% 79.3% 81.6%
Operator: Kozloduy Npp ,lc
Owner: State Enterprise “Radio Active Waste”; Bulgarian Energy Holding
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
2 facilities: 2 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Kozloduy NPP Site - Wet Storage AFR Wet Spent Fuel Storage (Pool) Commercial 600 t HM 2004– In Operation Kozloduy NPP
Kozloduy NPP Site - Dry Storage AFR Dry Spent Fuel Storage Commercial 300 t HM 2012– In Operation Kozloduy NPP
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$227
Lodging/Night
$192
M&IE/Day
$419
Total/Day
Bulgaria: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Kozloduy, Vratsa, Bulgaria
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Kozloduy Nuclear Power Plant.

Kozloduy is a nuclear power plant on the Danube river at the town of Kozloduy, Vratsa Province, in northwestern Bulgaria, close to the Romanian border.

Read more

Construction began in 1970, with work on the first reactor starting on 6 April 1970. Units 1 to 4 are VVER-440 (V-230) pressurized water reactors, and Units 5 and 6 are VVER-1000 (V-320) units. They were connected to the grid on 24 July 1974, 24 August 1975, 17 December 1980, 17 May 1982, 29 November 1987 and 2 August 1991. Units 1 and 2 were shut down on 31 December 2002, and Units 3 and 4 on 31 December 2006, under agreements made ahead of Bulgaria joining the European Union.