Kursk

Technical specifications, photos, nearby jobs, and satellite map for Kursk.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
7 units: 3 operational, 2 under construction, 2 permanent shutdown. Net capacity in service: 3,050 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Kursk 1 LWGR RBMK-1000 925 1972-06-01 1976-12-19 1977-01-12 2021-12-19 Permanent Shutdown
Kursk 2 LWGR RBMK-1000 925 1973-01-01 1979-01-28 1979-01-31 2024-01-31 Permanent Shutdown
Kursk 3 LWGR RBMK-1000 925 1978-04-01 1983-10-17 1984-03-30 Operational
Kursk 4 LWGR RBMK-1000 925 1981-05-01 1985-12-02 1986-02-05 Operational
Kursk 2-1 PWR VVER V-510 1,200 2018-04-28 2025-12-31 2026-04-27 Operational
Kursk 2-2 PWR VVER V-510 1,123 2019-04-15 2028-04-21 2028-09-10 Under Construction
Kursk 2-3 PWR VVER V-510 1,123 2025-12-24 2031-05-08 2031-12-01 Under Construction
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Kursk 1 925 1,000 3,200 1976-10-25 Atomenergomash Kharkiv Turbine Factory
Kursk 2 925 1,000 3,200 1978-12-16 Atomenergomash Kharkiv Turbine Factory
Kursk 3 925 1,000 3,200 1983-08-09 Atomenergomash Kharkiv Turbine Factory
Kursk 4 925 1,000 3,200 1985-10-31 Atomenergomash Kharkiv Turbine Factory
Kursk 2-1 1,200 1,253 3,300 2025-05-22 Atomenergomash Atomenergomash
Kursk 2-2 1,123 1,200 3,300 2028-03-10 Atomenergomash Atomenergomash
Kursk 2-3 1,123 1,200 3,300 2031-01-21 Atomenergomash Atomenergomash
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Kursk 1 231.1 TWh 63.7% 64.6% 72.3%
Kursk 2 236.9 TWh 64.9% 65.3% 74.8%
Kursk 3 253.8 TWh 74.3% 74.3% 78.0%
Kursk 4 254.4 TWh 78.4% 77.5% 80.6%
Operator: Joint Stock Company 'Concern Rosenergoatom'
Owner: Joint Stock Company 'Concern Rosenergoatom'
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Kursk NPP Site AFR Wet Spent Fuel Storage (Pool) Commercial 2000 t HM 1986– In Operation Rosenergoatom, Consortium
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$173
Lodging/Night
$112
M&IE/Day
$285
Total/Day
Russia: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Kurchatov, Kursk Oblast, Russia
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Kursk Nuclear Power Plant; IAEA PRIS: Russian Federation.

The Kursk nuclear power plant is on the Seym River in western Russia, about 40 km west of the city of Kursk. The city of Kurchatov was founded when construction began. The original station, Kursk I, has four RBMK-1000 graphite-moderated reactors.

Read more

Construction of Unit 1 started in the early 1970s. Unit 1 was connected to the grid on December 19, 1976, and permanently shut down on December 19, 2021. Unit 2 was connected on January 28, 1979, and shut down on January 31, 2024. Units 3 and 4 were connected on October 17, 1983, and December 2, 1985. Construction of the VVER-TOI units of Kursk II began with the first unit in April 2018.